cs 03084_0001.tif 2 009 INTERNATIONAL I I
CITY OF BLAIR REROOFING N C FF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
o lease indicate compliance with the following requirements
not interfere with reroofing work, p p �
following . this reroofing job.
Property Address: /0 L
Contractor or Homeowner (if self) : — ` AJ -
Permit #:
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with. the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
VOID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materia be adhered shall be primed prior to installation. (R907.6)
i atur of Pr4pnary nstalle D to
lg ture of Permit der We