Loading...
02915_0001.tif i i i Jun 08 2015 9:31AM HP Fax page 1 RES CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 216 S 16" Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements ollo Ing this reroofing job. Propertjt Address: Z �; Contractor or Homeowner (if self) : Permit #: Installati n ®atri: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with• the requirements of the building code. (R9D7.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: E)dsUn vent flashing, metal edges, 9 ga g , � drain outlets, pollars or metal counter - flashing were not reinstalled If rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prlor to installation.- (R907.6) Signature of Primary Ins a r Date Signature cf Permit Holde Date .. Y