02680_0001.tif I
Jun 08 2015 9,31 AM HP Fax page 2
Z009 INTERNATIONAL I
I
RES i
C OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Half prior to Final inspection
218 S 18 treet, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: Z le— CSC.e. L Cr L J _
Contractor or Homeowner (if self) : _ I `t "' �1 arh e C
Pon #: C1RSM 0 1 2 6 ° •
I
YES 0
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with, the requirements of the building code. (R907.1)
j
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underfayment or of a self- adhering polymer modified bitumen sheet was instalfed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL_ COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
❑ DID NOT USE RUSTE METAL OR FLASHING: Existing vent.€fashing, metal edges,
drain outlets, dollars or metal counter - flashing were not reinstalled If rusted. (R5U7.5)
• i
FLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
With approved manufacturers installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.-(R907.6)
Signature of Prima In r „ Date
Signature of Permit Rol Date
I
i
I
i