00423_0001.tif 06/08/2015 11:02 FAX 4025332173 Z001/001
CITY OF BLAIR REROOFING
Return to Blair City Hall prig to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
following, this reroofing job.
Property Address: 30
Contractor or Homeowner (if self) :
Permit: M -20
Installation [date: 0
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with- the requirements of the building code. (R907.1)
ICE PROTECTION 1hlS1'ALLED An Ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least f om the ea a to a poillt a least 4 inches inside the exterior
ve's ed
wall lute of the building. (R906.2.7.1)
STRUCTURAL, COMPONENTS ARE 60UNQ The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8907
EK[S iNG COVEtINO WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section RQ,07.3
DID NOT USE RUSTY METAL Ott FLAS HING: Existing vent gashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (11907.6)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Sign ure of Primary Installer Date
Date
Signature of Permit Hol er
i