Loading...
00423_0001.tif 06/08/2015 11:02 FAX 4025332173 Z001/001 CITY OF BLAIR REROOFING Return to Blair City Hall prig to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements following, this reroofing job. Property Address: 30 Contractor or Homeowner (if self) : Permit: M -20 Installation [date: 0 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with- the requirements of the building code. (R907.1) ICE PROTECTION 1hlS1'ALLED An Ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least f om the ea a to a poillt a least 4 inches inside the exterior ve's ed wall lute of the building. (R906.2.7.1) STRUCTURAL, COMPONENTS ARE 60UNQ The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907 EK[S iNG COVEtINO WAS REMOVED: Existing roof covering was removed for one of the reasons required by section RQ,07.3 DID NOT USE RUSTY METAL Ott FLAS HING: Existing vent gashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (11907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Sign ure of Primary Installer Date Date Signature of Permit Hol er i