Loading...
20150608105737659_0001.tif I i JUN, 5.2Q15 4;08PM NASTASE ROOFING N0.8582 P. 5 , INTERNATIONAL 1 I i CITY C. r REROOFING Return to Blair City Hall prior to Final Inspection 218 S 1 street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the foilowing requirements followinci this reroofing job. 9 Property Address: • x.(.9 q +�'• 6`6,6 Contractor or Homeowner (if self} : of z.,a Permim installation pate: YES NO The materials and methods of application used for recovering or replacing the sAsting roof covering comply with the requirements of the building code. (8907.9) • I ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at feast 24 inches insida . the exterior wall line of the building. (8905.2.7.9) I� S fRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WA S REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTizD Mi;TAL OR ]=LASHING; Existing vent flashing, - metal edges, _. . drain outlets, Dollars or metal counter - flashing were not reinstalled If rusted. (1907.5) E fi LA G INSTALLED PROPERLY: Flashing shR11 be reconstructed in accordance ZLbil tumalnous manufacturer's installation instructions. Metal flashing to which aterials are to be adhered shall be primed prior to installation. (R907.8) _ I sigKat ur of Primary Installer Date 69 — 6 7 arure of Permff Holder Date i i i