Loading...
Checkoff Sheet 02770_0001.tif I NTERNATIONAL RESIDENTIAL CODE QTY OF , LAIR REROOFING H K FF SH Return to Blair Cit Hall prior to Final Inspection 218S16 th Street, Blair, NE 68000 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing worts, please indicate compliance with the following requirements following this reroofing job. Property Address,` Contractor or Homeowner (If self) Per mit #: MS-20 Installation Date: e )�f v,EES� - NO U l The m aterials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,1) ICE PROTECTION INSTALLED An ice barrier that consists of at least o a two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's edge to a point at least 24 i nches inside the exterior wall line of the building, (8905,2.7,1) U STRUCTURAL COMPONENTS ARE SbUND: he structural T roof components are � capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) LJ I EXISTING COVERING WAS RE MOV ED: Existing roof covering was removed for one of the reasons required by section R907,3 DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, g, g r drain outlets, collars or metal counter- flashing were not reinstalled If rusted. (R907,5) L FLASHING INSTALLED PROPERLY Flashing hall be reconstructed in a g ac or .once with approved manufacturer's installation Instructions. Metal flashing to which b` Gminous materials are to be adhered shall be primed prior to Installation. (8907.6) 7 ore of Primary Installer pate 11��,a IV I,( Signature of Per older Date