Checkoff Sheet 02759_0001.tif I
h— lz ,�&
INTERNAT I I
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
216 S 16 Street, Blair, NE 68008 j
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the f ollowing requirements
following this reroofing job.
w � .. I
Property Address: G�."
Contractor or Homeowner (if self)
Permit #: MS -20 ,� � 1% .
Installation pate:
YES NO
I� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of sul porting`the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (11907,2)
I� EXIS COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons `required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (0907,5}
l� ❑ FLASHING INSTALLED eROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturers Installation Instructions. Metal flashing to which
bituminou aterials are to be adhered shall be primed prior to Installation. (R907.6)
Signat r o. ` P'rimary installer MFIA Date J j /p
., )
Signature of Perro Holder Date