Loading...
Checkoff Sheet 02759_0001.tif I h— lz ,�& INTERNAT I I CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 216 S 16 Street, Blair, NE 68008 j Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the f ollowing requirements following this reroofing job. w � .. I Property Address: G�." Contractor or Homeowner (if self) Permit #: MS -20 ,� � 1% . Installation pate: YES NO I� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of sul porting`the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907,2) I� EXIS COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons `required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (0907,5} l� ❑ FLASHING INSTALLED eROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers Installation Instructions. Metal flashing to which bituminou aterials are to be adhered shall be primed prior to Installation. (R907.6) Signat r o. ` P'rimary installer MFIA Date J j /p ., ) Signature of Perro Holder Date