Loading...
Checkoff Sheet 01830_0001.tif i i i I 2009 INTERNATIONAL RESIDENTIAL CODE MY OF BLAIR REROOFING CHECKOFF SHEEN` Return to Blair City Hall prior to f=inal Inspection 218 S 16 1h Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Q` Permit: ✓ ��1 I ©�a Installation Date: I YE,Q` NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and j extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) U STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 j i NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (13907.5) �j FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 15 Sign &6 of Pr' ary Installer Date j slgnaivr6 of Permit Holder Date