Loading...
Checkoff Sheet 002231_0001.tif 2 009 IN TER NATION A L NL I L CODE - CITY OF I BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followfing this reroofing job. Permit #: i Installation Date: YES NO [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i [� [� STRUCTURAL COMPONENTS ARE SOU tem and the material and equipment loads capable of supporting the roof covering y that will be encountered during installation of the roof covering system. (8907.2) j [� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) . FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) B Signafiure rir6ary Installer D e lgnatur of i older Date