Checkoff Sheet 002231_0001.tif 2 009 IN TER NATION A L NL I L CODE -
CITY OF I BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followfing this reroofing job.
Permit #:
i
Installation Date:
YES NO
[� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
I� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underiayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
i
[� [� STRUCTURAL COMPONENTS ARE SOU tem and the material and equipment loads
capable of supporting the roof covering y
that will be encountered during installation of the roof covering system. (8907.2) j
[� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
. FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
B
Signafiure rir6ary Installer D e
lgnatur of i older Date