Loading...
Checkoff Sheet 001912_0001.tif 0 INT M NT N L . CITY OF LIR REROOFING CHECKOFF SHE Return to Blair City Hall* prior to Final Inspection 218 S 16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would not iinterfere with reroofing work, please indicate compliance with the following requirements _ i following this reroofing job. Permit installation Date: I YES NO j The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) r ICE C'ROTE ON CNSTAlLED: An ice barrier that consists of at least two layers of CTI underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 U ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I . FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) .�s Signature of ary Installer ate e Signa ure of P4 older at