Loading...
Checkoff Sheet 02377.tif JUN -03 -2015 12:07 From:TIJ Construction LLC 7123522702 To:14024264195 Page:2 /2 CITY OF ' BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218S I S Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address. I' r Contractor or Homeowner (if self} J�, (Permit #: IV1S -20 Installation Date: -- �,' YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) j I STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I I EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one j of the reasons required by section 890793 t , + DID NOT USE DUSTED METAL OR FLASHING: Existing vent flashing, metal edges, r drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) rimary Installer ure gate Ll /, - -3 .I� Signs ure of Permit Holder D i i i I i