Loading...
Checkoff Sheet 03325_0001.tif Jun. 3. 2015 'No. 1463 2­ 9 INTERNATIONAL RESIDENTAL UUU .00 OITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City mail prior to Final InsPeCtion. 218 S 16P Street, Blair,, NE 68008 li t p er f orm d inspections which would Because of limitaflons caused by the infoasibi not Interfere wltb reroofing work, please Indicate compliance with the following requirements following this reroofing job. Permit #: Litai ��A � � Installation Date: I L �L —I L 4 YES NO The materials and methods of application used f recovering or repWng the existing roof covering comply with the requirements of the building code. (R907.1) CE RO C-TION INSTAi INSTALL Ea; An ice barrier that consists Of at least two laYer jta undeflayment or of a seV-adheflng polymer modified bitumen sheet was 11 l�lq and extends at le from the gjg!a�to a point at least 24 lnc_b sinsi SL atbeextedor wall line of tho building. (R905.2,7•1) MUMURAL COMPON F ,NjaAgg SOUND The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (RQ07.2) STING COVEMG WPLS_P_-EMOVEq, Existing roof coveting was removed for one of the reasons required by section R907.3 C3 NO RUSIgn METAL OR FLAS Fisting vent flashing, metal edges,. - drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED pagpg.RLY Flashing shall be reconstructed in accordance with approved manufaeWrefs installation instructions Metal flashing to which us materials are to be adhered shall be primed prior to installation. (8907.6) Data Signature of primary Installer ignaty r of Pernft d er Date of Pe ffift K d(