Loading...
Checkoff Sheet 03074_0001.tif i Jun. 3. 2015 11:52AM No. 1463 VP, 4-r1 ) -d INTERNAT 1 I CODE CITY 1 R REROOFING CHECKOFF Return to Blair City Hall prier to Final inspection j 218 S 16 Street, Blair, NB 88808 Because of limitations caused by the Infeasibility to perform detailed inspections which would not intarfare with reroofing work, please indleate compliance with the following requirement following_ this reroofing job. Property Address: �_ ' (��( Contractor or Homeowner (if self) -- \J`�1 r � Permit #: IVIS-,�o�,� I, Installation Date: YES � �O Q The matedala and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) I ( ICE PROTECTION INSTALLED An loo barrier that oonsists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and j extends at least from the eave's edge to a point at least 24 inches insideinside the exterior wall line of the building. (1906.2.7.1) STRUQTU AL COMPONENTS ARE 5t7UND: The structural roof components are capable of supportibg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DIF3 NOT USE RUSTI=C► METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.9) FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) ° I Sig at of trim In ,talle date Signature o ermit '[o er date I