Loading...
Checkoff Sheet 01785_0001.tif i Jun. 3. 2015 11:51AM No. 1463 P. 3 INTERNATI RES CITY I REROOFING R eturn to B lair City Hall prior to Final Inspection 21 1h street, B lair, NE 68008 I 13ecause of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #• S — �� u(o 0- - 9 - Installation Date: YES NO , or 13 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasone required by section 1907.3 NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5} _I i j FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminou rngterials are to be adhered shall be primed prior to installation. (11907.6) - I { icgna urn Pri a ' installer Date I MU l - ign ure of P it Hold Date I I