Loading...
Checkoff Sheet MS-2014-02737_0001.tif 06/02/2015 TUE 10:22 FAX 0 001 /003 2009 INTERNATIONAL RESIDENTIAL CODE' C ITY OF BLAIR FIN FF SHEET Return to Blair C ity Hall prior to Final Inspection 2'18 S 16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. 7 -4- Property Address: f Contractor or Homeowner (if self) hermim MS -20 �- �. Installation Date: YES NO ❑� ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ® ❑ ICI~ PROTECTION INSTALLED An Ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed g—e to a point at least 24 inches insEde the exterior wall line of the building. (R906.2.7.1) I ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ ® EXIST{NG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ ❑ DID NOT USE RUST8D METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, oollars or metal counter - flashing were not reinstalled if rusted. (R907.6) ® FLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signs u e of Primary Installer Date j Signature of Nrmit Hoider Date i i i