Checkoff Sheet MS-2014-02737_0001.tif 06/02/2015 TUE 10:22 FAX 0 001 /003
2009 INTERNATIONAL RESIDENTIAL CODE'
C ITY OF BLAIR FIN FF SHEET
Return to Blair C ity Hall prior to Final Inspection
2'18 S 16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job. 7 -4-
Property Address: f
Contractor or Homeowner (if self)
hermim MS -20 �- �.
Installation Date:
YES NO
❑� ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
® ❑ ICI~ PROTECTION INSTALLED An Ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed g—e to a point at least 24 inches insEde the exterior
wall line of the building. (R906.2.7.1)
I
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ ® EXIST{NG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ ❑ DID NOT USE RUST8D METAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, oollars or metal counter - flashing were not reinstalled if rusted. (R907.6)
® FLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signs u e of Primary Installer Date
j
Signature of Nrmit Hoider Date
i
i
i