Loading...
Checkoff Sheet MS-2014-00660_0001.tif i 06/02/2015 TUE 10:20 FAX 0003 /003 CODE CITY L I R REROOFING CHECKOFF SH Return to Blair City Hall prior to Final inspection 218 S 16 Street, Blair, NE 68008 j Because of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with rerou rbig work, plea** inclicafe oomplianoo with tho following raguirnmpnfs foilowin this reroofing job. y Property Address; Contractor or Homeowner (if self) Permit #: MSw20J - 00 Installation Date: YES�t O (� ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply witli the requirements of the building code. (R907,1) i ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) d ❑ EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section R907.3 ] ❑ DID NOT USE RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) I LI ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance With approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to instal lation. S ure of Primary Installer Date ign V-/"-,I- G 0 - 2—is Signature of Permit Holder Date