Checkoff Sheet MS-2014-00660_0001.tif i
06/02/2015 TUE 10:20 FAX 0003 /003
CODE
CITY L I R REROOFING CHECKOFF SH
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008 j
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with rerou rbig work, plea** inclicafe oomplianoo with tho following raguirnmpnfs
foilowin this reroofing job. y
Property Address;
Contractor or Homeowner (if self)
Permit #: MSw20J - 00
Installation Date:
YES�t O
(� ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply witli the requirements of the building code. (R907,1)
i
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
d ❑ EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section R907.3
] ❑ DID NOT USE RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
I
LI ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to instal lation.
S ure of Primary Installer Date
ign
V-/"-,I- G 0 - 2—is
Signature of Permit Holder Date