Checkoff Sheet MS-2015-00171_0001.tif ;4UU9. INTERNATIONAL RESIDENTIAL COM
Return to (air City Hq(l rj ; 6 1 • 1 ion f
218 8 to S treet, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform 'detalled Inspections which
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job,
Property Address,
i
Contractor or Homeowner (if self) v �
Permit #, -201
Installation Date: �--
YES Nth
' The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building cods- (R907.01)
ICE P OTECTION An Ice barrier that consists of at least two layers of
I
underlayrnent or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's'edge to a point at le'ast'24 inches inside. the exterlor
wall line of the building, (R905.2.7.1)
STRUCTURAL, COMPONENTS ARE SOUND'. The structural roof components are r
capable of support(ng the roof covering,system and tha material,and equipment loads
that will be encountered during Installation of the roof covering system. (8907,2)
EXISTING COVERING WAS REMOV D, Existing roof c e i s.:e ove .
_ � E ng r f ov r ng wa r m d for one..:
of the reasons requlred by'sectlon R907.3,'
DID NOT USE RUSTED .META1., GR FLASHING: Existirig flashing, metal edges,
drain outlets, collars or metal cpunter- flashigg wore not relr7stal,Ied ,f rusted' (8907.5}
FLAS' HING INSTALLED PROPERLY. Flashing shall be reconstructed In accordance
with approved 'rhanufacturer's�installatlon instr0ct ar s; a $tal�flashing to which =
bituminous materials are to be adhered shall be primed prior to installation. (R907.6),
Sign tur ate a
r
re of ritTiolder
L7ata
TIA
i