Loading...
Checkoff Sheet MS-2014-03113_0001.tif I FROM HOME RENOVRTORS,INC FAX NO. 4026252567 Jun. 01 2015 12:11PM P1 INTERNATI RESIDENTIAL CODE' CITY OF BLAIR REROO C HECKOFF � Return to flair City Hall price to Final Inspection 218S 6 th street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements kj[23 Ina this reroofing job. Property Address: �+ / 4 _ Contractor or Homeowner (if self) : e npn e Permit it: MS-211 YES NO C� The materials and methods of application used for recoverin or r eplacing the existing roof covering comply witlithe requirements of the .building code, (11907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of urzderlayment or of a self - adhering polymer modified bitumen sheet was installed . and extends at least from the eave's edge to a point at least 24 inches- insido the exterior wall line of the building. (8900.2.7.1) STRUCTUPAL COMPONENTS ARE SbUNDc The structural roof components are capable of supporl?hg the roof covering system and the material and equipment loads that Mil be encountered during installation of the roof covering system.. (8907,2) EXISTWG COVERING WAS REMOVED. Usting roof covedrg was removed for one Of the reasons required by section l�_ .9 Olt) NOT USE RUSTIEQ METAL OR PLASHING: Mdating vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROFBRLY: Flashing shall be reconstructed In accordance with approved manufacturer's ineWlation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. - (11907,6) Signature of Primary Installer bate gna. ri °of Perm 1t er mate