Checkoff Sheet MS-2014-03113_0001.tif I
FROM HOME RENOVRTORS,INC FAX NO. 4026252567 Jun. 01 2015 12:11PM P1
INTERNATI RESIDENTIAL CODE'
CITY OF BLAIR REROO C HECKOFF �
Return to flair City Hall price to Final Inspection
218S 6 th street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
kj[23 Ina this reroofing job.
Property Address: �+ / 4 _
Contractor or Homeowner (if self) : e npn e
Permit it: MS-211
YES NO
C� The materials and methods of application used for recoverin or r eplacing the existing
roof covering comply witlithe requirements of the .building code, (11907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
urzderlayment or of a self - adhering polymer modified bitumen sheet was installed . and
extends at least from the eave's edge to a point at least 24 inches- insido the exterior
wall line of the building. (8900.2.7.1)
STRUCTUPAL COMPONENTS ARE SbUNDc The structural roof components are
capable of supporl?hg the roof covering system and the material and equipment loads
that Mil be encountered during installation of the roof covering system.. (8907,2)
EXISTWG COVERING WAS REMOVED. Usting roof covedrg was removed for one
Of the reasons required by section l�_ .9
Olt) NOT USE RUSTIEQ METAL OR PLASHING: Mdating vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROFBRLY: Flashing shall be reconstructed In accordance
with approved manufacturer's ineWlation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. - (11907,6)
Signature of Primary Installer bate
gna. ri °of Perm 1t er mate