CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Full prior to Final inspection j
218 S i6th street, Blalr, NB 68008
Because of limitations caused by the Infeasibility to perform detailed Inspeetlons which would
no Interfere with reroofing work, please Indicate corrtptlance with the following requirements
allow
im this reroofing job.
property' Address
Contractor or Homeowner (If self)
Kermit #: -
Installation Date; t - ► - I
YES NO
CJ ® The materials and methods of appiloation used for recovering or rsplaeing the existing
roof covering comply with the requirements of the building node. (8907.1)
I CE PROT CTION INSTALLED: An Ica barrier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was Installed and
extends at east f_rom the eav 'sad a to a point gj least 24 Inches kie the exterior
wall line of the building. (R905.2.7, I)
ArRUCTU AL. COMPONENT$ AR 50UNI t The structural roof components are
capable of supporting the roof cov6ring system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8907.2)
r ISTI t3 DDV NG W EMU D: Pxlsting roof covering was removed for one
of the reasons required by section R907.3
DID jq0T U,9g &USTep 15T OR Fi_ ING Usting vent flashing, metal edges,
drain outlets, gollars or metal counter flashing were not reinsta lied if rusted. (8907.5)
P'LASIJI Q INSTALLED PfQEERLY; Plashing shell be reconstructed In accordance l
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primad prior to Installation. (R907.6)
6 /
II I
o, 1
V$Ignatof oHolder Ua te
pate