Loading...
Checkoff Sheet MS-02967_0001.tif i i 0610112015 12:07 ITAX) P.0011002 INTERNATIONAL CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Full prior to Final inspection j 218 S i6th street, Blalr, NB 68008 Because of limitations caused by the Infeasibility to perform detailed Inspeetlons which would no Interfere with reroofing work, please Indicate corrtptlance with the following requirements allow im this reroofing job. property' Address Contractor or Homeowner (If self) Kermit #: - Installation Date; t - ► - I YES NO CJ ® The materials and methods of appiloation used for recovering or rsplaeing the existing roof covering comply with the requirements of the building node. (8907.1) I CE PROT CTION INSTALLED: An Ica barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at east f_rom the eav 'sad a to a point gj least 24 Inches kie the exterior wall line of the building. (R905.2.7, I) ArRUCTU AL. COMPONENT$ AR 50UNI t The structural roof components are capable of supporting the roof cov6ring system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907.2) r ISTI t3 DDV NG W EMU D: Pxlsting roof covering was removed for one of the reasons required by section R907.3 DID jq0T U,9g &USTep 15T OR Fi_ ING Usting vent flashing, metal edges, drain outlets, gollars or metal counter flashing were not reinsta lied if rusted. (8907.5) P'LASIJI Q INSTALLED PfQEERLY; Plashing shell be reconstructed In accordance l with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primad prior to Installation. (R907.6) 6 / II I o, 1 V$Ignatof oHolder Ua te pate