Loading...
Checkoff Sheet i 0610112015 12:08 TAX) P.0021002 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING CHECKOFF SHEET i I R eturn to Blair City Hall prior to Final inspection 218 8 16 Street, Blair, NE 68008 Because of limitations caused by the Infessiblilty to perform detailed Inspections which would nA Interfere with reroofing work, please indicate compliance with the following requirements follow this reroofing job. Property address: Contractor or Homeowner (if self) ; . '� 1 n gftt ter. a v' - h. Permit#i: installation bats: 1 D •- iW fl 1 YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907 °1) ICE PROTECTION INSTALLF, An ice barrier that 0onsists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least rots the eaye'a md to a point at least 24 incLenside the exterior wall line of the building. (R905.2.71) amligIURAL COMPC�NIKN S AR SOUND The structural roof components are capable of supporting the roof co0ring system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907 irXISTING COVERING WAS REM Existing roof covering was removed for one of the reasons required by section 11907.3 D NOT USE RU ED ME16L OR FL 5 INtx: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (R907.5) FLAgHING INSTALLED P_ROPERLI l Flashing shall be reconstructed In accordance With approved manufacturer's installation instruotlons. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (R907.6) tt ra of r° ary Instal er Date" re pate of Per t Holder i i i i i I I