Loading...
Checkoff Sheet MS-02072_0001.tif S CODE, 2009 INTERNATIONAL RE rior to Final Inspection return to Bl air hY Hall' p rior Zug S `16 Street, Blair, 11— 68008 p the infeasibility to 't detailed inspections which would Because of limitations caused by indicate compliance with the following r not interfere with reroofing work, please 3 followin this re roofing job. w I Permit #: installation Date: YE NO ation used for recovering or replacing the existing ding The materials and methods of appl[c code. (R907A) roof covering comply with the requirements of the buil STALLED: An ice barrier that consists of a eet wa tw stalled and �J ICE PROTECTION I N modified bitumen sh underlay or of a self - adhering polymer oint at least 24 inches inside the exterior at le from the eave ed to a p wall line of the building. (R906.23.1) orients are UCTURAL COMPONENTS AR : SOUND: and struc ial roof quipment loads STR the roof covering system capable of supporting s stem. (8907.2) that will be encountered during installation of the roof covering y RING WAS REMOVED: Existing roof covering was removed for one ® EXISTING COVE section R907.3 of the reasons required by ETAL OR FLASHING: E xistin vent flash ifmusted�(R907 5)n NO RUSTED M c were not reinstall outlets, collars or metal counter - flashing G INSTALLED PROP PROPERLY Flashing shall be reconstructed in ac to FLASHIN accordance with a pproved manufacturer's installation instructions. Meta d prior ton allation• (R907.6) bituminous materials are to be adhered shat b prime— 'Daft Sign a ure a rimary I taller ' ID Si -ure of rmit Holder