Checkoff Sheet MS-02072_0001.tif S CODE,
2009 INTERNATIONAL RE
rior to Final Inspection
return to Bl air hY Hall' p rior
Zug S `16 Street, Blair, 11—
68008
p
the infeasibility to 't detailed inspections which would
Because of limitations caused by indicate compliance with the following r
not interfere with reroofing work, please 3
followin
this re roofing job.
w I
Permit #:
installation Date:
YE NO ation used for recovering or replacing the existing ding
The materials and methods of appl[c code. (R907A)
roof covering comply with the requirements of the buil
STALLED: An ice barrier that consists of a eet wa tw stalled and
�J ICE PROTECTION I N modified bitumen sh
underlay or of a self - adhering polymer oint at least 24 inches inside the exterior
at le from the eave ed to a p
wall line of the building. (R906.23.1)
orients are
UCTURAL COMPONENTS AR : SOUND: and struc ial roof quipment loads
STR the roof covering system
capable of supporting s stem. (8907.2)
that will be encountered during installation of the roof covering y
RING WAS REMOVED: Existing roof covering was removed for one
® EXISTING COVE section R907.3
of the reasons required by
ETAL OR FLASHING: E xistin vent flash ifmusted�(R907 5)n
NO RUSTED M c were not reinstall
outlets, collars or metal counter - flashing
G INSTALLED PROP
PROPERLY Flashing shall be reconstructed in ac to
FLASHIN accordance
with a pproved manufacturer's installation instructions. Meta
d prior ton allation• (R907.6)
bituminous materials are to be adhered shat b prime—
'Daft
Sign a ure a rimary I taller '
ID
Si -ure of rmit Holder