Loading...
Checkoff Sheet MS-2014-02722_0001.tif i i May, 29. 2015 3; 56PM No, 2882 P. 2/2 INTERNATIONAL RESIDENTIAL CITY OF BLAIR (N CHECKOFF SHEET Return to Blair City Hail prior to Final Inspection 218S I 6th street, Blair, NB O8008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followlp this reroofing job. CTS Property Address: Contractor or Homeowner (if self) Permit #' ' MS-2O Installation pate; YES NO ( The materials and methods of application used for reoovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) IcE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of r underlayment or of a self - adhering polymer modified bitumen sheet was instal and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPON15NTS ARE SOLINQ: The structural roof components are capable of supporting the roof covorlhg system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907 ExISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RU5T1 D METAL OR FLASHING: Existing Vent flashing, metal edges, drain outlets, Dollars or metal counter- flashing were not reinstalled If rusted. (R907.5) FLASHING INSTALLED pROP'ERI,`t: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous erials are to be adhered shall be primed prior to Installation. (8907.6) Signature of Primary Inst data Yjg — naturd of Permit Molder Date i