Loading...
Checkoff Sheet MS-2014-02648_0001.tif i i May, 29. 2015 3; 55PM No. 2881 P. 2 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR r CHE SHEET Return to Blairr City Hall prior to Final inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibili to perform detailed inspections which would not Interfere with reroofing worm, please Indicate compliance with the following requirements fallowing this reroofing job. • Property Address: Contractor or Homeowner (if self): Permim MS -20 Installation Bate: YES NO �l The materials and methods of application used for recovering or replacing the existing roof covering comply with. the requirements of the building code. (8907.1) IC5 PROTECTiON INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior 'Wall line of the building. (89475.2.7.1) y STRUCTURAL COMPONENTS ARE SOUNp: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (11907.2) EXISTING coyrRiNG WAS REMOVED, Existing roof covering was removed for one of the reasons required by section 11907.3 pit) NOT US)_ RUSTOD METAL OR F HING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (Rg07.5) FLASHING I14STAU -51) IPROPI =RLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (8907,6) nature of Primary Instal Crate � gnature o Permit Holder date I