Loading...
Checkoff Sheet MS-2014-02655_0001.tif ,2009 INTERN CITY OF13LAIR REROOFING CHECKOFF SHEEi R eturn W Blair city mall prior to Final inspectio I 21 a S 'Ie S tr eet, B lair, NE 68008 � Because o f limitations caused by the infeasibility to perfo e�wl h ng quir h e�nts got interfere with reroofing work, please indi Cc�mplia follovuin this reroofing job. T I Lt'i props Address: * Contractor' or Homeowner {l #self} : permit . installation Rats:._3 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) of ICE pRpTECTI{)N INSTALLED An Ice barrier th s le wa� y � undertayment or of a self- adhering polymer modifi bitumen (� extends at least from the save "s ed a to a point a east .inch inside the exterior wall line of the building. (R905.2.7.1) are gTRU CTt1RAL COMPONENTS ARE s The struc tural aterlal o d rnpon loads capable of supporthg the roof covering system and the m that will be encountered during installation of the roof covering system, +(11907, � ) EXIS COVERING WAS MOVED: E sting row vering was removadifor one of the reasons required by section 8907.3 UIL) OT USE Rt.iSTE© lVtEfAI+ unt OR FLASHING" Existing not e vent 11eflashing, red.e(a� eci 5) drain outlets, collars or metalcoer -fla S FLASHING INSTA4LEp PRt7PERLY Flashing shall be reconstructed t t whirl ,rdance with approved manufacturer's installation instructions. Metal l ashing o bituminous materials are to be adhered shalt be primed prior to lnstaliation.� (R90 7.8) t y jop r Installer to 0/ t Holder ' Dat f a 6 d 0 696- 666 -ZOV ';suoci V W010eJ3 IsemPIN 0 09:60 9 6 9Z AM