Checkoff Sheet MS-2014-02830.tif i
MAY /27/2M /WED 03:13 PM FAX No, P. 002/003
2009 INTERNATIONAL RESIDENTIAL CODE'
C ITY OF B LAIR REROOFING
Return to Blair City Hall prior to Final Inspection j
218S16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
QII wing this ror+oofing job.
Properly Address:
Contractor or Homeowner (if se1q : + bgrbt�
Permit #: MS-20 _Z5
Installation Date;
Y NO
The Materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTirCTION iNSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was Installed and
extends at least from the eaye's ede to a point at least 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVF-13: Existing roof covering was removed for one
f the reasons required by section 8907.3
DID NOT U SE RUST80 METAL OR PLASHING: Existing vent flashing, metal edges,
Train outlets, collars or metal counter flashing were not reinstalled If rusted. (1907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation.. (ROO7.0)
�f
Sign 'of Pri all d to
Signatu -d Perrnit t lol Date
µ
I