Loading...
Checkoff Sheet MS-2014-02830.tif i MAY /27/2M /WED 03:13 PM FAX No, P. 002/003 2009 INTERNATIONAL RESIDENTIAL CODE' C ITY OF B LAIR REROOFING Return to Blair City Hall prior to Final Inspection j 218S16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements QII wing this ror+oofing job. Properly Address: Contractor or Homeowner (if se1q : + bgrbt� Permit #: MS-20 _Z5 Installation Date; Y NO The Materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTirCTION iNSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's ede to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVF-13: Existing roof covering was removed for one f the reasons required by section 8907.3 DID NOT U SE RUST80 METAL OR PLASHING: Existing vent flashing, metal edges, Train outlets, collars or metal counter flashing were not reinstalled If rusted. (1907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.. (ROO7.0) �f Sign 'of Pri all d to Signatu -d Perrnit t lol Date µ I