Loading...
Checkoff Sheet MS-2015-00404.tif i 05/26/2015 08:10 FAX 4025332175 001/001 I NTERNATIONAL RES C Return to -Blair City Hall prior to Final inspection j 218 S 16 street, Flair, NE 68008 because of limitations caused by the infeasibility to perform detailed inspections which would no interfere with reroofing work, please indicate compliance with the following requirements fo llow j nq this reroofing Job. Property Address; Contractor or Homeowner (If self) : . Permit #: NI��2O � ��• Installation Cate: YES NO 1P C1 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was: installed_ and extends at least from the cave's e_ dge to a paint at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) vtgUCTURAL COMPONEN S ARE OU C: The structural roof components are capable of supporting the roof covoring system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUS iT D MgAL OR FL SHING: EAsting vent flashing, metal edges, drain outlets, goners or metal counter - flashing were not reinstalled If rusted. (R907,6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) I Sig a f Primary Installer pate Signature of Permit Holder Date I