Checkoff Sheet MS-2015-00404.tif i
05/26/2015 08:10 FAX 4025332175 001/001
I NTERNATIONAL
RES
C
Return to -Blair City Hall prior to Final inspection j
218 S 16 street, Flair, NE 68008
because of limitations caused by the infeasibility to perform detailed inspections which would
no interfere with reroofing work, please indicate compliance with the following requirements
fo llow j nq this reroofing Job.
Property Address;
Contractor or Homeowner (If self) : .
Permit #: NI��2O � ��•
Installation Cate:
YES NO
1P C1 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was: installed_ and
extends at least from the cave's e_ dge to a paint at least 24 inches inside the exterior
wall line of the building. (R906.2.7.1)
vtgUCTURAL COMPONEN S ARE OU C: The structural roof components are
capable of supporting the roof covoring system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUS iT D MgAL OR FL SHING: EAsting vent flashing, metal edges,
drain outlets, goners or metal counter - flashing were not reinstalled If rusted. (R907,6)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
I
Sig a f Primary Installer pate
Signature of Permit Holder Date
I