Loading...
Checkoff Sheet MS-2014-02928.tif i I f May 26 1612:36p ERD 4028610002 p.1 �2 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Flair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. 1 Property Address - I i � � I ! Contractor or Homeowner (if self) Permit #. MS -2041�-- Installation fate: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with- the requirements of the building code. (11907.1) l ® ICE PROTEGTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (11905.2.7.1) ro STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be a hered shall be primed prior to installation. (R907.6) i tur f I ate _✓ //: ure of P ' o er Date