�2
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Flair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. 1
Property Address - I i � � I !
Contractor or Homeowner (if self)
Permit #. MS -2041�--
Installation fate:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with- the requirements of the building code. (11907.1)
l ® ICE PROTEGTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
ro STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.6)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be a hered shall be primed prior to installation. (R907.6)
i tur f I
ate
_✓ //:
ure of P ' o er Date