Loading...
Checkoff Sheet MS-2014-02733.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218S16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: Contractor or Homeowner (if self) I Lo- r st v Permit#. MS-20_lj �0133 Installation Date" 5f, Y NO The materials and methods of application used for recovering or replacing the existing roof covering comply wlt4 the requirements of the building code. (R907.1) ICE PROTECTI )N INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edg to a point at lea 24 inches inside the exterior wall line I of the building. (8905.2.71) j o STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting portihg the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) C3 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTEZ METAL OR FLASHING .Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed priorto installation.- (R907.6) 5-7, Z0115 I Signature of Primary Installer' Date 0(4yy, NAI 1 ,rwu, co, 5 301 Signature of Permit Holder Date