Loading...
Checkoff Sheet MS-2014-02668 (2).tif i � May, 26. 2015. 3:16PM No. 1430 P. 2 RESIDENT 2009 INTERNATIONAL CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of Iimitatiells caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requiremonta fQiiowlna this reroofing job. Property Address: 1 = J��,� &� � Va l l V&b Contractor or Homeowner (if self) hermit #: MS -2O Installation date: y YES NwJ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An fee barrier that consists of at least two layers of unde- dayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) 0/ STRUCTURAL COMPONENTS ARE S( UM. The structural roof components are capable of supporting the roof cov6dhg system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907,2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R807.3 DID NOT' USE RUSTED META. 0 FLASHING: Existing vent flashing, metal edges, drain outlets, Qollars or metal counter - flashing were not reinstalled if rusted, (1.907.6) ❑ FLASHING INSTALLrED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which uminous materials are to be adhered shall be primed priorto installation.-(R907.6) sign ur of Prima Ins r Date Signature o rmit Hod Date