Loading...
Checkoff Sheet MS-2014-01945.tif I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET M Return to l it � y Hall prier to Final Inspection 218 16 street, lair, NE 68048 Because of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work„ Tease Indicate compliance with the following requirements follo this reroofing job, Property Address Contractor or Homeowner (if self) Permit #: S-20 / - ,, Installation bate: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) � ICE PRI TI TIt N;1l�l TALLED: An Ice barrier that consists of at least two layers of j underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are capable of spporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907,2) EXISTING C JVERING WAS R 'MOVt ©. Existing roof covering was removed for one of the reasons required by section R97. DID NC T USE RUSTED METAL. 00 LASi41Nt�; Existing vent flashing, mewl edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) 1- INSTALLED PROPERLY: Flashing shall e reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitu In materials are to be adhered shall be primed prior to Installation. (R907 6) Siena r of i`'rimary In taller Date Date ignature of Pe Holder