Loading...
Checkoff Sheet MS-2014-02885.tif i I i 2009 INTERNATIONAL RESIDENTIAL t;u CITY OF BLAIR REROOFING CHECKOFF SHEET Return to . Blair City Hall prior to Final Inspection th 218 S 16 Street, Blair, NE 6$ 008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing worts, please Indicate compliance with the following requirements fgff2W!ffl this reroofing job. Property Address; r Iv Contractor or Homeowner (if self) Al Permit #: MS - 20 L� L Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) [� ICE PROTEGTIt N INSTALLED. An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at lea st, from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (8945.2.7.1) STRUCTURAL COMPONENTS ARE SOUND . The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING V�fAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR PLA Existing vent flashing, metal edges, drain outlets, cgllars. or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig tore of Primary Installer Rate Z) ) -S' S �g of Permit Holder Date