Checkoff Sheet MS-2014-02550.tif i
0/22/2015 48;18 FAX 4025392173
2009 INTERNATIONAL �IOp1 /QQ1
I
RESIDENT
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
218 S is street, Blair, NE 68008
Because of limltatlons caused by the infeasibility to perform detailed inspections which would
no Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job,
Property Address!, ! j q ij5jcl� tom` LJ
Contractor or Homeowner (if self) : r�
i
Permit #, IVI -20 —q-- C�� i .
Installation Data _ 11 9/1 /1 , - i
YES NO
Q The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building coda, (R907.1)
ICE PROTECTION INS"l'ALLED; An ice b.arrler that consists of at least two layers of
underlayment or of a self - adhering polymer modifled bitumen sheet was installed and
extends at least frotti the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905,23.9)
STRUCTURAL COMPONENTS ARE 6gOU Q: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (R907,2)
Ly! EXIS i NG COVERING WAS REMOVI;D: Existing roof covering was removed for one
777 "' of the reasons required by section R907.3
RID NOT USE RUST5R IVIF -TAL Og FLASHING Existing vent flashing, metal edges,
drain outlets, cellars or metal counter- flashing were not reinstalled if rusted, (R907.5)
Q FLASHING INSTALLED PROP'I =RLY: Flashing shall be reconstructed In accordance
with approved manufacturers installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation.. (8907.6)
�Z
Signature of Primary er pate
Date
Signature of Permit Holder