Loading...
Checkoff Sheet MS-2014-02260.tif 05/21/2015 12:09 4025720154 UNITED SERVICES PAGE 01/01 CITY OF BLAIR REROOFING CHECKOFF SHEET i R eturn t4 Blair City Hall prior to inal inspection 218 S 16 Street, Blair, NE 88008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the followings requirements foilnwin�r this reroofing ,job. Property Address: k - - — Contractor or Homeowner (if self) : t /�� i ( s ae S OP� "�� - Permit: Installation Date, YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (0907.1) -- ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural root components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (0907.2) El EXISTING COVERING WAS REMOVED: Existing roof cover was removed for one of the reasons required by section 8907.3 131D NOT USE RUST1513 METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary inst ller Date Date Signature of Permit Holder