Checkoff Sheet MS-2014-01397.tif 2009 INTERNATIONAL RESIDEN. '.I ' CODE
CI TY ® n ` G' CHECKOFF SHEET ,
Return t® Blair City Hall prior to Final Inspecti ®n
21 8 S 16 St reet, Blair, NB 68008
Because of limitations caused by the infeasibility td perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followlna this reroofing job.
Property Address:
Contractor or Homeowner (if self) ; P 1 1 "O
i
Pe rmi t #; MS-2014- Mf
Installation Date; r
. i
YE NO
l� The materials and methods of application used fqr recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
I� ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to •a point at least 24 inches inside the exterior
• wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND': The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WA S REMOVED; Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL. OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with' approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907.6)
AI
S' a re of P i ary in taller Date
S ature of Per it older Date y