Checkoff Sheet MS-2014-00514.tif 1
i
j
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Half prior to Final inspection i
218 S 16 Street, Blair, NE 68008
erform detailed inspe
Because of limitations caus ctions which would
ed by
i
the infeasibility top re uirements
not interfere with reroofing work, please indicate compliance with the following q
followin q this reroofing job.
Permit #: � � � � �
installation Date:
YE NO
[i The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
STALLED: An ice barrier that consists of at least two layerrsa d
ICE PROTECTION IN of mer modified bitumen sheet was mstalle
underlayment or of a self - adhering p the exterior
Y
extends at least from the eave's edge to a point at least 24 inches inside
wall line of the building. (89052.7.1)
STRUCTURAL COMPONENTS ARE SOUND and the material and equipment loads
s upporting the roof covering system
capable of supp stem. (8907.2)
that will be encountered during installation of the roof covering system.
G COVERING WAS REMOVED: Existing roof covering was removed for one
E}CISTIN .
of the reasons required by Section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metedges, dra
outlets, collars or metal counter - flashing were not reinstalled if rusted.
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed s t Wnichordance
with approved manufacturer's
be i ntelat shall be primed prior to installation. (8907.6)
bituminous materials are to
Date
Sig to of Primary Installer,
5
Date
Si atu e f Permit Holder