Loading...
Checkoff Sheet MS-2014-00514.tif 1 i j 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Half prior to Final inspection i 218 S 16 Street, Blair, NE 68008 erform detailed inspe Because of limitations caus ctions which would ed by i the infeasibility top re uirements not interfere with reroofing work, please indicate compliance with the following q followin q this reroofing job. Permit #: � � � � � installation Date: YE NO [i The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) STALLED: An ice barrier that consists of at least two layerrsa d ICE PROTECTION IN of mer modified bitumen sheet was mstalle underlayment or of a self - adhering p the exterior Y extends at least from the eave's edge to a point at least 24 inches inside wall line of the building. (89052.7.1) STRUCTURAL COMPONENTS ARE SOUND and the material and equipment loads s upporting the roof covering system capable of supp stem. (8907.2) that will be encountered during installation of the roof covering system. G COVERING WAS REMOVED: Existing roof covering was removed for one E}CISTIN . of the reasons required by Section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metedges, dra outlets, collars or metal counter - flashing were not reinstalled if rusted. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed s t Wnichordance with approved manufacturer's be i ntelat shall be primed prior to installation. (8907.6) bituminous materials are to Date Sig to of Primary Installer, 5 Date Si atu e f Permit Holder