Checkoff Sheet MS-2014-02707.tif i
i
May. 19, 2015 5:46PM Flo, 1410 P. 7
INTERNAT I
REROOF CITY OF BLAIR
Return to Blair C ity Hall prior to Final Inspection
218 � 6 # ' ' street, Blair, NE 68008
Because of limitations caused by the infeasibility to Perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
follo ing this reroofing job.
-7
Permit
Installation pate
I4
YES NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
i
® ICE PROTECTION INSTALLED: An ice harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at Least 24 inches inside the exterior
wail line of the building, (I1905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND The structural roof components are
capable of supporting the roof covering system and the material and equipment ioads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Mewl flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
S na re of Primary Installer ate
Signature f Permit of r ate
0,