Loading...
Checkoff Sheet MS-2014-02707.tif i i May. 19, 2015 5:46PM Flo, 1410 P. 7 INTERNAT I REROOF CITY OF BLAIR Return to Blair C ity Hall prior to Final Inspection 218 � 6 # ' ' street, Blair, NE 68008 Because of limitations caused by the infeasibility to Perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follo ing this reroofing job. -7 Permit Installation pate I4 YES NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) i ® ICE PROTECTION INSTALLED: An ice harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at Least 24 inches inside the exterior wail line of the building, (I1905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are capable of supporting the roof covering system and the material and equipment ioads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Mewl flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) S na re of Primary Installer ate Signature f Permit of r ate 0,