Loading...
Checkoff Sheet MS-2014-02522.tif RES 2009 INTERNATIONAL CIT OF BLAIR REROOFING CHECKOFF SHEET R eturn to Blain city Hall prior to Final lnspecOon 21 s i 6th street, Blair, NE 68008 Secause of limitations caused lay the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fEllowin this reroofing job. e Address: ` Property �...,� Contractor or Homeowner (if self) :'` Kermit M. MS -20.__1q__ . Installation Date: Y N The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE'RO'C�C`I[!C)N INS7ALLEI3. An ice barrier heet was in stalled and underlayment or of a self - adhering polymer mod ified bitumen s extends. least from the eav e to a point at least 4 inches inside the exterior wall line of the building. (894 5 7 ) ( ❑ STRUCTURAL COMPONENTS ARE SOUND: The the material and equipment Dads capable of supporting the roof covering system and roof covering system. (8947.2} that will be encountered during installation. of the EXI rING COWERING WAS RE1111 D Existing roof covering was removed for one RVE of the reasons required by section , DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, pollars or metal counter - flashing were not reinstalled if rusted. (8957.5) FLASHING INSTALLED PRO DERLY: Flashing shall be reconstru in a h p with approved manufacturers installation instructions. Metal 9 to bituminous materials are to be adhered shall be primed prior to installation. (8947.5) Signature f ri ler al Date e of Perms Holder Date