Loading...
Checkoff Sheet MS-2014-02411.tif May, 20. 2015 4:40PM No. 6126 P. 1 INTERNAT I CHECKOF CITY OF BLAIR REROOFING SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requirements following this reroofing job. Property Address I b Udix L QU 0 Contractor or Homeowner (if self) hermit#: MS -20 - ����.� - Installation [date: YE' S NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with- the requirements of the building code. (8947.1) ICI= PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was instilled and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8906.2.7.1) STRUCTURAL COMPONENTS ARE SQUND The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during instailation of the roof covering system. (R907.2) F- XISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R9 07.$ DID NOT USE RUST15D METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which ituminous materials are to be adhered shall be primed prior to installation. (R907.6) Arff Signature ,of Primary Installer D ate Signat tit Holder pate ufe o P i I