Checkoff Sheet MS-2014-02189 (2).tif I
I
5:45PM ..._.... ----- ._._- .,,.�.,.. _ - No. 1410 — P.
May, 19. 2015 6"
INTERNAT
CITY OF BLAIR REROOFING
Return to Blair City ball prier to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibift to perform detailed Inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
follovA ng this reroofing job,
�.iq X1 0
Permit 9: f
0 45 -
Installation Datc
y'ES NO E
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building rode. (8907.1)
ICE AR6Tl= CTI0N LED An lee 'barrier that consists of at ieast two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installl d_ ' and
extends at least from the eave's edge to.a point at least 24 inches inside the exterior
wall line of the building. (R905,2.7.1)
91 [ STFt[JCTl.11AL COMP AREtUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that w411 be encountered during installation of the roof covering system, (8907.2)
F EXISTING QTSING WAS REMOVED: Existing roof covering was removed,for one
of the reasons required by section R907.3
a NO RUSTED METAL OR FLASHING; Ustin,g vent flashing, metal edges, drain
outlets, cellars or metal counter- flashing were not reinstalled if rusted, (8907.5)
FiASiiINC 11V5TALLED PROPERLY
- Flashing shall be reconstructed in acoordanre
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be, adhered shall be primed }prior to installation. (8907.6)
Signs re o ns Ier Crate
8 gnatu of Permit Helder Date