Checkoff Sheet MS-2014-02476.tif May.15.2015 11:20AM No. 2710 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE'
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final inspection !
298 1 Street, Blair, NE 88008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
Property art Address; - U t� C c 1 Vl � -- " " I
VVA
p y
Contractor or Homeowner (if self)
Permit 4: M S -20 1q —
Installation Date; `
i
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
[� ICE PROTECTION INSTALLED: An Ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are
capable of supporting the roof co0ring system and the material and equipment loads
that will be encountered during installation of the roof covering system. (1907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 88073
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
draln outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
[�
FLAWING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (13007.6)
Si u of Primary s I Date
Signature & a er date