Loading...
Checkoff Sheet MS-2014-02476.tif May.15.2015 11:20AM No. 2710 P. 2 2009 INTERNATIONAL RESIDENTIAL CODE' CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final inspection ! 298 1 Street, Blair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job. Property art Address; - U t� C c 1 Vl � -- " " I VVA p y Contractor or Homeowner (if self) Permit 4: M S -20 1q — Installation Date; ` i YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) [� ICE PROTECTION INSTALLED: An Ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are capable of supporting the roof co0ring system and the material and equipment loads that will be encountered during installation of the roof covering system. (1907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 88073 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, draln outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) [� FLAWING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (13007.6) Si u of Primary s I Date Signature & a er date