Checkoff Sheet MS-2014-02185.tif i
05/15/2015 07:24 4025545909 HSCONT PAGE 01/01
'00^ INTERNATIONA L RESIDENTIAL CODE
CITY OF BLAIR it
REROOFING
i
Return to rair C ity Hall prior to Final lnspGGtion
210 1 Street, Blair, NE 68008 f
Secause of iimitations caused b the Infeasibi t o perform detailed inspections which w ould
not interfere with reroofing work, please Indicate compliance with the following requirements
f0II2V±1 A this reroofing job.
Property Address; 7 Al
n
Contractor or Homeowner (if seif}
Permito: MS-2014--
Installation Dale.
YE No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (1907,1)
ICE PROTECTION INS TALLED: An ice barrier that consists Of at least two layers of
underlayment or of a self adhering polymer modified biturnen sheet was instal d and
extends at least from the eave's edge to .a paint at feast 24 Inches inside the exterior
' wall line of the building, (8906.2.7,1)
STRUCTURAL Cc MI c�NI;NTS ARE SUUNp; The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTiNG CO VERING tN,4,S ICI= lVIc0V1 =D, Existing roof covering was removed for one
of the reasons required by section 8907,3
DID NOT USE RUSTEn METAL UR I;I...ASHING: Existing vent flashing metal e dges ,
drain outl 'ets, collars or meted counter - flashing were not reinstalled if rued. (R907,5)
PLASHING INSTALL PROPERLY: Flashing shall be reconstructed In accordance
With approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907,6)
S i at of Prim ry InstaFior Date
Signature of Permit Hold r fate
I
i