Checkoff Sheet MS-2014-01417.tif I
May. 15. 2015 3:20PM No. 1405 P. 3
Lu09 INTERNATIONAL RESIDENTIAL CODE
CITY OF w Y
I
BLA REROOFING CHECKOFF SHE T
story to Blair CM y Hall prior t Final In pG ti n
218 S 1 street, Ma NE 68006
Because of limitations causod by the infeasibility to perform detailed inspections which would
i
not Interfere with reroofing warp, please indicate compliance with the following requiret�en�
jqff2wiM this reroofing job.
Fermat #R
-�[ l
i
Installation Date.
YE& NO
U The materials and methods of application used for recovering or repiaoing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION iIVSTALLF-0 An ice barrier that conslsts of at least taro hers of
underlayment or of a self - adhering polymer modified bitumen sheet . was installed and
extends at least from the, eave's ed o to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTSARE 80UND; The structural roof components are
capable of supporting the roof covering system and the material and equipment leads
that will be encountered during installation of the roof covering system. (8907.2)
STING COVERING
O DING WAS REMOVED: Existing roof covering was removed for one
of the reasons rewired by section R907.3
I
NO RUsTr=p METAL OR FLA5HIN x, Usting ver►t flashing, metal edges, drain
outlets, collars or metal counter - flashing were not if rusted. (R907.5)
i
FLASHI INSTALLED PRO.P_I=RLY; Flashing' shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6) j
Signature f Primary Installer ate
I/ JJ - I Igo W--
)�2 - -1 - �, ... — Sig store of Pe if Holder Date