Loading...
Checkoff Sheet MS-2014-01213.tif i l i i 2009 INTERNATIONAL 7 CITY OF BLAIR l SH Return to Blair City Hall prior to Final inspection 218 S 16 Street., (Blair, NE 6808 Because of limitations caused by the infeasibility to'perform detailed inspections which would not Interfere with reroofing work, please indicate co mpliance with the following requirements followln this reroofing job. Permit #• ' �_ y Installation Date: •` � '�^ ' � � � YES NO l � I� The materials and methods of applicatiop used for recovering or replac the existing roof covering comply with the requirements of the building code, (R907.1) i I� IC PROTECTION INSTALLEf : An icelbarrier that consists of at least two layers of E underlayment or of aself- adhering polyrY�er modified bitumen sheet was sinfialled and extends at feast f rom the eave's aci a to a point at roast 24 inches inside the exterior wall lirieofthe building. (89052.7.1) ' STRUCTURAL C(}MFONEMTS ARE St3UND: The structural roof components are capable of supporting the loaf covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) E�1STtA1G COVERII�IG WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R9073 ' NO RUSTED METAL OR ( Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R9 07.5) i [� FLASHING 1148TALLED PROPERLY: dashing shall be reconstructed in accordance with approved manufacturer`s instailatioin Instructions. Metal flashing to which bituminous materials are to be adhered"Ishall be primed prior to installation. (1907.6) i / Date Signature of primary Install Signature of Permit 1101de s` Date Z'd a09 :80 9 6 Lo ABN i