Checkoff Sheet MS-2014-01213.tif i
l
i
i
2009 INTERNATIONAL 7
CITY OF BLAIR l SH
Return to Blair City Hall prior to Final inspection
218 S 16 Street., (Blair, NE 6808
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not Interfere with reroofing work, please indicate co mpliance with the following requirements
followln this reroofing job.
Permit #• ' �_ y
Installation Date: •` � '�^ ' � � �
YES NO
l �
I� The materials and methods of applicatiop used for recovering or replac the existing
roof covering comply with the requirements of the building code, (R907.1)
i
I� IC PROTECTION INSTALLEf : An icelbarrier that consists of at least two layers of
E
underlayment or of aself- adhering polyrY�er modified bitumen sheet was sinfialled and
extends at feast f rom the eave's aci a to a point at roast 24 inches inside the exterior
wall lirieofthe building. (89052.7.1)
' STRUCTURAL C(}MFONEMTS ARE St3UND: The structural roof components are
capable of supporting the loaf covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
E�1STtA1G COVERII�IG WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R9073
' NO RUSTED METAL OR ( Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R9 07.5)
i
[� FLASHING 1148TALLED PROPERLY: dashing shall be reconstructed in accordance
with approved manufacturer`s instailatioin Instructions. Metal flashing to which
bituminous materials are to be adhered"Ishall be primed prior to installation. (1907.6)
i
/
Date
Signature of primary Install
Signature of Permit 1101de s` Date
Z'd a09 :80 9 6 Lo ABN
i