Loading...
Checkoff Sheet MS-2014-02244.tif i t I i i 200 INT ERNATIONAL SHEET TI CITY LAIR R ROOFING CH C F Return to Blair City Hall prior to Final In8pectlon 218 S 16 Street, Blair, NE 6800 the infeasibility to perform detailed inspections which would � Because of limitations caused by compliance with the following requirements not interfere with reroofing work, please indicate f this reroofing job. q I A fi ) _ _f r Property Address. 1 , d 1 4 Contractor or Homeowner (if self) Permit #: Installation Date: YES NO lication used for recovering or replacing the existing The materials and methods of app ❑ roof covering comply with the requirements of the building code. (R907.1) ROTE INSTALLED: An ice barrier that of at least was led and ❑ ICE P of mer modified bitu underlayment or of a self - adhering p y oint at least 24 inches inside the exterior extends at l east from the eave's edge to a p wall line of the building. (8905.2.7.1) components are ❑ STRUCTURAL COMPONENTS ARE SO s eD The t h e material and equipment loads capable of sup y porting the roof covering y s stem. (8907.2) /71 that will be encountered during installation of the roof covering EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one ® of the reasons required by section R907.3 ❑ DID NOT USE :RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, dram outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5 ❑ FLASHING INST ALLED PROPERLY: Flashing shall be reconstructed W accordance rdance with approved manufacturer's in sall red s hall be primed prior t in Illation. (8907.6) bituminous materials are to be a t �� V Date Si a ure of Primary Installer Date Si nature of Permit Holder