Checkoff Sheet MS-2014-02244.tif i t
I
i
i
200 INT ERNATIONAL
SHEET
TI
CITY
LAIR R ROOFING CH C F
Return to Blair City Hall prior to Final In8pectlon
218 S 16 Street, Blair, NE 6800
the infeasibility to perform detailed inspections which would �
Because of limitations caused by compliance with the following requirements
not interfere with reroofing work, please indicate
f this reroofing job. q I
A fi ) _ _f r
Property Address. 1 , d 1 4
Contractor or Homeowner (if self)
Permit #:
Installation Date:
YES NO lication used for recovering or replacing the existing
The materials and methods of app
❑
roof covering comply with the requirements of the building code. (R907.1)
ROTE
INSTALLED: An ice barrier that of at least
was led and
❑ ICE P of mer modified bitu
underlayment or of a self - adhering p y oint at least 24 inches inside the exterior
extends at l east from the eave's edge to a p
wall line of the building. (8905.2.7.1)
components are
❑ STRUCTURAL COMPONENTS ARE SO s eD The t h e material and equipment loads
capable of sup y
porting the roof covering y s stem. (8907.2)
/71 that will be encountered during installation of the roof covering
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
® of the reasons required by section R907.3
❑ DID NOT USE :RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
dram
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5
❑ FLASHING INST
ALLED PROPERLY: Flashing shall be reconstructed W accordance
rdance
with approved manufacturer's in sall red s hall be primed prior t in Illation. (8907.6)
bituminous materials are to be a t
�� V Date
Si a ure of Primary Installer
Date
Si nature of Permit Holder