200" RESIDENTIAL CODE
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final Inspection
218 8 18 Street, Blair, NE 68008
Because of limitations caussd by the infeasibility to perform detailed inspections which would
riot interfere with reroofing worts, please indicate compliance with the following requirements
'�oiiOwing this reroofing job.
Property Address: 3
Contractor or Homeowner (if self)
Permit: MS- 2014- D
Installation bate: 9
s NO
. 0 The materials and methods of application used for recovering or repiacin the existing
roof covering comply with the requirements of the building code. (1 907.)
i0E I'IOTEGTION [ STA4i.ED
- , Are ice barrier that consists of at least two layers of
underiayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (1905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are
capable of supporting the roof covering sysferri and the material and equipment loads
that will be encountered during installation of the roof covering system, (8907,2)
EXISTING COVERING WAS
REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3 -
C]ID NOT U5E
RUSTED METAL. OR FLASHING; existing vent flashing, metal edges,
drain outlets, coli;ars or metal counter - flashing were not reinstalled if rusted. (R907,5)
Ft.
— AS HIN INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation, (R907.6)
Si at of Prim ry Installer pate
`' 3 f `
S old r Gate
�I