Loading...
Checkoff Sheet MS-2015-00178.tif i 2009. INTERNATIONAL RESIDENTIAL CODE CITY OF 13LAIR RERO0P1aGZHE'CKbFF Et' Return lair it Hall , r i �a.l'i ; ec i S treet, lair', . Because of limitations caused by the Infeasibility to perform detailed Inspections which Mould not interfere with reroofing work, please' indicate compliance with the following'requireffients followlM this reroofing job. Property Add ressp ( �. Contractor or Homeowner {if self} Permit . Installation Date: YES 'NO /. The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the b uilding code° (8907:9) , ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of f underlayment or of a self-adhering polymer modified bitumen sheet was installed and T extends at least from the'eaye's`'edge toe point at le'ast24 inches inside the exterior wall line of the building, (R906.2.7.1), STRUCTURAL GOMP0 N T S ARE SOUND': The structural rook components are � capable of supporting the roof covering`systerri and the material.and equipment loads that will be encountered wring installation of the roof covering system. (8907,2) EXISTING COVERING WAS REM VEDA Existing roof covering was removed for one of the reasons required by section [907,3 DID NOT USE. RUSTED METAL OR FLAfHING. Existing vent flashing, metal edges, drain outlets, collars or metal oounter flashing were not reinstalled If rusted. {8907,5) WHING INSTALLED PROPERLY e' Flashing shall be reconstructed in accordance with approved nnanufabtur4es installation Instrubtlons., Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907;6) at all ri er mature rmit HoIder Date