Checkoff Sheet MS-2014-03288.tif i
I
I
i
i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
i
Return I it City t I prior t i Inspection
218 S Street, Blair, NE 68008
Because of limitations caused by the Infbasibillty to perform detailed inspections which would
not Interfere with reroofing or , please indicate compliance with the following requirements
fall ino
this reroofing job.
Property Address- 14 U1
Contractor or Homeowner (if self)
Permit II `
Installation Date: t
YES 'NQ
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION I TALL . An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SO 11 : The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EYJSTING COVERING REMOVED- Existing roof covering was removed for one
of the reasons required by section 8907,3
I
D ID NOT USE RUSTED METAL OR FLASHING, Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled If rusted. (8907.5)
i
FLA SHING INSTALLED P PE Lr. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which j
bituminous aterials are to be adhered shall be primed prior to installation. (8907.6)
Sig p ure o Primary Installer Da
i nature o Permit Folder Date
i