Checkoff Sheet MS-2014-02851.tif i
I
`E
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return Blair i ( prior to Final Inspection
1 t Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere reroofing work, please indicate compliance with the following uireme
folio int this reroofing job.
P roperty Addre i
Contractor or Homeowner (if self)
Pe it : -
Installation Date: 06 zo t
YES
The materials and methods of application used for recovering or replacing the existing
V
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION iN T LL : An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet Mg installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL CO _P E _'r E SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (11907.2)
EYJSTING COVERING A E VED: Existing roof covering was removed for one
of the reasons required by section 8907.3
D NOT USE RUST L OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled If rusted. (8907.6)
FLASHINg. INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
SlgnqW61 Primary Installer ate
4
Signature , Permit Holaer Date
i
I