Loading...
Checkoff Sheet MS-2014-02677.tif i i i 2009 INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to i Inspection W" Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would j not Interfere it reroofing work, please indicate compliance with the following requirements followin is reroofing job. Property Address. - Contractor or Homeowner (if self) : AAI i Permit a - - na 2 1 Installation Date: 10 1! 10 Y;r C3 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTIO N _INSTALL An ice barrier that consists of at least two layers of undedayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i STRUCTURAL NE TS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EYJSTING COVERING REMOVED: Existing roof covering was removed for one of the reasons required by section R907. DID NOT USE RUSTED FLASHI Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INS P LY. Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (11907.6) i ure of Primary Installer ate Signature 1 Pe It Wilder Date