Loading...
Checkoff Sheet MS-2014-02676.tif i I 2009 INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET Return i r City Hall prior to Final ! ti 218 S 16" Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, Tease indicate compliance with the following requirements followin this reroofing job. Prope - Contractor or Homeowner (if self): d. t- 14 Installation ate: YES N The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED _ eon ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) S TRUCTURAL COMPONENTS ARE gOC! : The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) STI E is A REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 0 El l D ID NOT USE RUSTED MEL& EL t Existing ent flashing, , metal edges, 9 9 drain outlets, collars or metal counter-flashing were not reinstalled If rusted, (8907.5) ELASHING INSTALLED PRO LY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous ma rials are to be adhered shall be primed prior to Installation. (8907.6) Sign We of Primary staller Date Slnatur , f PrWit older ate I i i